Help

How copy bottom summary bar configuration across views

Topic Labels: Base design
469 0
cancel
Showing results for 
Search instead for 
Did you mean: 

Can’t copy the setup of the SUMMARY bar (or whatever it’s called) across views.

I have a few views in my base. On the bottom there are totals (or sum, max, is-empty etc counters). I want to copy the confirmation between views. Is there a check box I mised?

I don’t want recreate views and they are all different. But the bottom totals are configured in the same way across the views.

0 Replies 0