Projects appearing in Primary Field for Tasks

How do I get my projects (which is a primary field), to be linked to my tasks records? For some reason when I link two tables, they do not appear on the table to be linked.

Here is the project tab, with the projects being the primary field

Here is the Tasks field where the project field should be linked to

I add the linked “tasks” field from the Tasks table

And the linked field from the Projects table does not show up in the Tasks Table

Hi @Nnenna_Anwara
It looks like you have some hidden fields in the Projects table, can you validate that the linked field is not hidden?

1 Like

Oh my goodness! That was the issue. Thank you so much!

1 Like