New here, thanks in advance for reading.
I’ve created a base to track our company’s 2022 Hiring Plan. It is working great. However, there are changes that occur that I want to log like I would in a spreadsheet. Just a simple date field, maybe a tag field and i single line that is longer than the notes field.
- 06/21. MMasked us to push his design req to Q3
- 06/30. PS wants to cancel the SW Eng req
- 07/22. Recruiter was told to hold on Director req.
We have an ATS. But a one line journal of material changes would be incredibly helpful for housekeeping.
I cannot think of how to do this.
WDYT?