Help
Noah_Cates
5 - Automation Enthusiast
5 - Automation Enthusiast
since ‎Jun 21, 2018
‎Nov 29, 2022

User Statistics

  • 3 Posts
  • 0 Solutions
  • 10 Kudos given
  • 11 Kudos received

User Activity

In Calendar View, an event (i.e. record) that has a time included in the Date/Time field is automatically shown to have a duration of 1 hour. This is very visible when looking at the Week, 3-day, or 1-day view.I can’t find any way to change this. I t...
My situation: I’m a tutor with many students; for each student, I have multiple lessons scheduled. I have a base with 2 tables: STUDENTS and LESSONS. Each entry in LESSONS is linked to one student, and each entry in STUDENTS is linked to multiple les...