I have two bases in the same workspace. Base A with records 0001 to 4999, and Base B with records 5000 to 9999. I want to combine the two bases into one new Base C with records 0001 to 9999. So I duplicate Base A, rename the duplicate Base C, which at that point contains the records 0001 to 4999. Then I copy records 5000 to 9999 from Base B, and I want to add them to Base C after record 4999. And that’s where it ends, that is not possible, because I can’t find any way to add them. When I click the + for adding a record, then I get the message “Record moved”, and a new record is created at the beginning of the base, so it makes a new record 0001. And if I try to copy multiple records, then I get the message that I’m trying to perform a paste that overwrites all the records in the base. So records 5000 to 9999 are not added to the base, but records 0001 to 4999 will be overwritten. I know I must be doing something wrong, but I haven’t any clue what that could be.