Jan 17, 2024 02:11 AM
I want to calculate the average income per hour correctly by dividing sum of total price by sum of total hours. In the left number the average is calculated incorrectly by dividing the sum of income per hour with the number of projects. Is this possible? I would need calculations in the interface I guess.
Oct 31, 2024 07:25 AM
I'm running into the same exact issue, really hoping there's a way.
Nov 04, 2024 01:31 AM
I ended upp exporting everything to Power BI to be able to do the calculations I needed. 😞