Hi,
I've built a team utilisation and created a timeline that allows me to see how I have committed my resources across different projects. As part of this utilisation, I have a table where I can log days off for each team member. Currently, I enter the dates one by one using the date field.
I want to do this differently so I don't have to enter the days off one by one using the date field, because I sometimes need to include consecutive days off, and wonder if there is a way to have those days appear as a date range instead.
I have a google calendar that shows each team members days off, and sometimes the time off can be a week. I want to pull these days off into Airtable and have them display as a date range.
Is this possible?