Hello all, I have two tables.
MONTHS : https://airtable.com/shrkKQn1rwn5Bcjks
DAYS: https://airtable.com/shraNAmopa2LDZQxV
Is there any way to make automation that each time I change manually the date of a record in DAYS table, it changes the field MONTHS wich is a link to the MONTHS table?
i.e.: When the date is 12/01/2023 (European) it must be linked to the "23/01" record in MONTHS table, and if I change manually this date to 12/02/2023, the automation should change the link to the "23/02" record.
Thanks