How do I get my projects (which is a primary field), to be linked to my tasks records? For some reason when I link two tables, they do not appear on the table to be linked.
Here is the project tab, with the projects being the primary field
Here is the Tasks field where the project field should be linked to
I add the linked “tasks” field from the Tasks table
And the linked field from the Projects table does not show up in the Tasks Table