Exploring AirTable for use with Google Sheets. I do not understand the built-in option for Google Drive connection. It seems to provide for 2-way syncing: If Sheet is updated then the connected AirTable base is updated. It also sounds like updating the base (with a form entry) would also update the G-Sheet.
I’ve set up the connection and used the Google import to create a base from a Google sheet. But I am not seeing synching in either direction when I edit the G-sheet or when I update the base with a form submission. Maybe there is another configuration step I am missing (maybe scheduling frequency? I looked but have not found that setting.)
But other posts outline using 3rd party connector services (Zapier, Integromat, etc.) to do this.
Can someone clarify what synching is provided by the Google Drive connection in Airtable ?
Thank you!

