Skip to main content

I am trying to create a timeline table to assist with tracking heavy volume days.


The first option once I choose to create a timeline- it gives me a drop down with several options.


"Using date range from (Due Date) to (Date Entered) **both ( ) fields are drop downs.


When I select those 2 options- i get the follow error message


" The above fields cannot be displayed because DUEDATE and Entered have configurations that are not compatible. "


What I am trying to do is create a “Puck” like timeframe where I can view all of our open work orders-

each one identified by a puck (bar) that runs from date entered to due date.


Any ideas as to how I can get the dates to communicate correctly?


I included a screenshot of the error message I am receiving.


Thank you in advance.

Hi @Office_Personnel

I think that your two date fields are in different time zones. Open the config for both of them and check the Formatting tab.


Reply