Hi!
We rely extensively on AT for updating “downstream” tools. We previously had a complex workflow that involved checking off a box when the update was made and then using a series of formulas to say “if the field was modified after that checkbox was made, the downstream tool needs an update.” Because we have so much data in AT, this was dozens of formulas.
I’d like to use the “date modified” field instead, but am not sure how to or if I can store the date modified information or if it will only show the most recent one. In other words, is it a use it or lose it? If the field is modified 9/19 and then again 9/20, is there a way to see both dates by creating a formula?
Thanks!

