Hi,
We have different bases in a single workspace that correspond to specific projects. One tab in each base is the project schedule.
We would like to link all of these up in a separate ‘master-schedule’ base that can house a Gantt chart to keep track of our project pipeline. We would rather not have all the projects (dozens of tabs) in a single base. Is this possible with Airtable?