I have an automation I want to run every 6 months (that is on Jan 1 and then on July 1 each year) and I set it as every 6 months on the 1st at 12:00am starting 1/1/2023 and then it doesn’t begin to trigger until 6/1/23 12:00am. (see the image here)
I can’t for the life of me figure out why the timing is off. I also have an automation that runs annually and it’s doing something similar seen here.
My daily/monthly automations didn’t do this at all so it has to be something I’m misinterpreting or isn’t documented where I’ve looked.
