Skip to main content

I have dates on two tables and I want to get the sum of a different number on each table. I have a task table with a date on it and a field that has the duration of the time expected to complete the task in interger format. I have another table that pulls in my google calendar. It has dates on it and a field with a duration on it in interger format. I want create a grid that gives me the next two weeks day by date and the sum of those two duration fields. Is this possible? What is the easiest way to do it?

Be the first to reply!

Reply