Hi
I have a script that needs building, or developing form existing scripts (I have two good references to pull from), to check for scheduling clashes in a system that timelines tasks. I need essentially the same script to be implemented three times to check against three different fields (tools, spaces and people).
If this is of interest please get in touch and I will share a video that explains things in a little more detail.
Thanks!
Jon