How to Copy and Paste Collaborator

  • Nov 24, 2020 11:44 PM UTC
  • 0 replies
  • 9 views

I have imported a small project schedule prepared by Excel, which as PiC field.
After I imported it to AirTable, the Collaborator Filed in AirTable could not detect the PiC Field.
So I end up to add assign task one by one.
Is there a faster way to do this? say copy and past even by column?